Railways
Tunnels
Bridges
Buildings
Energy
Roads
Protechning contributes solvency in road execution thanks to our experience in this type of projects. We have developed new creation projects for highways, ring roads, widening highways with intermittent traffic cuts…. Protechning has provided specialized personnel in all phases and productive departments of this type of project, being involved in phases such as data collection, control and calculation of earthworks, site topography, installation of GPS systems, project design, production engineers, work execution planning, affected services,…
Our main concern is to offer a competent team that allows these projects to be carried out optimally and, consequently, allows people to traffic in a fast, comfortable and secure way through a network. of high quality roads.
Winston-Salem Northern Beltway
The project involves the construction of a new 3-lane highway for each direction over 4 miles (6.4 km) between US 158 and I-40 in Forsyth County. The work also includes the corresponding links with these two highways, the construction of 18 bridges and the placement of acoustic screens.
US 181 Harbor Bridge Replacement
The project involves the construction of the largest cable-stayed bridge in the United States. This bridge crosses the entrance channel to the port of Corpus Christi, with six sections and a maximum span of 504 meters in the main section.
D4R7 Bratislava
El D4R7- Bratislava Bypass consiste en el diseño, construcción, financiación y operación de 27 km de la autopista D4 alrededor de Bratislava, Eslovaquia, así como de 32 km de la autopista R7.
M11 Gorey-Enniscorthy
PPP Contract for Design, Construction, Operation and Maintenance of 40 km of new highway in Wexford County, Enniscorthy. The project runs 26 km of standard highway with two carriageways (M11 main line) of 120 km / h speed between Cloghand Scurlocksbush
Auckland Northern Corridor
This tender provides better links for travelers on the Northern Expressway (SH1) in Auckland and improves transportation options in the North Shore for cars, pedestrians and cyclists.
Homestead Extension of Florida’s Turnpike (HEFT)
Extension of SR 821 (HEFT) from Florida Turnpike to south of Miramar Parkway, in Miami-Dade and Broward counties. The HEFT main highway widens from four lanes to eight lanes, three 12-foot general-purpose lanes and a 12-foot express lane.
Connector East End
The North Carolina Department of Transportation builds the East End connector in Durham County to provide a direct connection between the Durham Expressway (NC 147) and Miami Boulevard (US 70), two major east-west triangle roads.
Fort Lauderdale Project
Design and construction of Phase 3A-2 of the Interstate 95 (I-95) Express Lanes project that runs north from Commercial Boulevard at 15,537 km to SW 10th Street at 23,710 km in Broward County, at a distance total of approximately 8.2 miles.
SR23 Toll Road
Ampliación y mejora de la State Road 23 desde el norte de Argyle Forest Boulevard hasta el sur de la I-10 (6 millas).
N25 New Ross Bypass
The N25 New Ross Bypass is a 14km dual carriageway that includes new connections on National Routes N25 and N30. The beltway begins on the N25 at Glenmore
Route 5-Section La Serena-Vallenar- Algarrobo Route
The section between La Serena and Vallenar on Route 5 North consists of a comprehensive improvement of the section from the north exit of the city of La Serena to the southern access to Vallenar, with an approximate length of 187 kilometers.
Winston-Salem Northern Beltway
The project involves the construction of a new 3-lane highway for each direction over 4 miles (6.4 km) between US 158 and I-40 in Forsyth County. The work also includes the corresponding links with these two highways, the construction of 18 bridges and the placement of acoustic screens.
Protechning contributed the Directorate of Topography, as well as office and field topography and the Directorate of Earthworks
US 181 Harbor Bridge Replacement
The project involves the construction of the largest cable-stayed bridge in the United States. This bridge crosses the entrance channel to the port of Corpus Christi, with six sections and a maximum span of 504 meters in the main section. The structure is 62 meters wide to allow access to the Corpus Christi port for the largest transoceanic ships, including those that cross the Panama Canal.
Protechning contributed to the project the head of the Purchasing Department, as well as purchasing technicians.
D4R7 Bratislava
El D4R7- Bratislava Bypass consiste en el diseño, construcción, financiación y operación de 27 km de la autopista D4 alrededor de Bratislava, Eslovaquia, así como de 32 km de la autopista R7. La nueva autopista D4 de 27 km creará un desvío hacia el este de la ciudad y una conexión con las carreteras radiales existentes. El proyecto también implica la construcción de la nueva autopista radial R7 de 32 kilómetros, que corre en dirección sur-este desde el centro de la ciudad.
El proyecto contruirá 14 conexiones con autopistas existentes, 122 puentes y un gran puente sobre el Danubio.
Protechning proporciona equipos de topografía de campo especializados en carreteras y grandes estructuras
M11 Gorey-Enniscorthy
PPP Contract for Design, Construction, Operation and Maintenance of 40 km of new highway in Wexford County, Enniscorthy. The project runs 26 km of standard highway with two carriageways (M11 main line) of 120 km / h speed between Cloghand Scurlocksbush; 8 km (N30 Mainline, Enniscorthy Bypass) of standard single carriageway between existing N30 and existing N11 and 4 km (N80 Link Road) between existing N11 / N80 intersection, north of Enniscorthy, and M11. Also the realignment of approximately 11 km of side roads.
Protechning contributed the topographic field work, both for earthworks and structures.
Auckland Northern Corridor
This tender provides better links for travelers on the Northern Expressway (SH1) in Auckland and improves transportation options in the North Shore for cars, pedestrians and cyclists. Includes a new highway connection between SH1 and SH18, which opens access to the Western Ring Route and the airport.
Protechning contributed to this tender civil engineers specialists in structural calculation and cost estimation engineers.
Homestead Extension of Florida’s Turnpike (HEFT)
Extension of SR 821 (HEFT) from Florida Turnpike to south of Miramar Parkway, in Miami-Dade and Broward counties. The HEFT main highway widens from four lanes to eight lanes, three 12-foot general-purpose lanes and a 12-foot express lane. Other project work includes milling and repaving, road widening, bridge widening, pavement marking, lighting, ITS, noise walls, and drainage improvements.
Protechning provides specialized field surveying equipment, as well as surveying headquarters.
Connector East End
The North Carolina Department of Transportation builds the East End connector in Durham County to provide a direct connection between the Durham Expressway (NC 147) and Miami Boulevard (US 70), two major east-west triangle roads. Improves access to I -85 and I-40. The estimated cost for such a project amounts to $ 142 million.
The work involves building a 1.25-mile highway from NC 147 to US 70 and converting approximately 2.75 miles from US 70, which will be part of the East End Connector, into a highway.
Protechning provides surface surveyors and surveying aids.
Fort Lauderdale Project
Design and construction of Phase 3A-2 of the Interstate 95 (I-95) Express Lanes project that runs north from Commercial Boulevard at 15,537 km to SW 10th Street at 23,710 km in Broward County, at a distance total of approximately 8.2 miles.
Protechning contributed the Directorate of Topography and field topography.
SR23 Toll Road
Ampliación y mejora de la State Road 23 desde el norte de Argyle Forest Boulevard hasta el sur de la I-10 (6 millas).
Las actividades de construcción incluyeron dos nuevos carriles entre New World Avenue y 103rd Street (State Road 134), cambio de todo el pavimento existente dentro de los límites del proyecto, construcción de nuevos intercambiadores en New World Avenue, Normandy Boulevard (State Road 228) y 103rd Street (State Road 134), construcción de instalaciones de peaje automatizadas, construcción de muros antiruido y construcción de drenajes y un sistema subterráneo de aguas pluviales.
Protechning proporcionó equipos de topografía de campo especializados, así como jefes de oficina técnica que trabajaron sobre el diseño del Proyecto.
N25 New Ross Bypass
The N25 New Ross Bypass is a 14km dual carriageway that includes new connections on National Routes N25 and N30. The beltway begins on the N25 at Glenmore, then crosses the Barrow River with a 3-stack bridge approximately 900 meters long from Pink Point to Stokestown in Wexford County and continues to the N30 junction at Corcorans Cross.
Protechning contributed the topographic field work, both for earthworks and structures.
Route 5-Section La Serena-Vallenar- Algarrobo Route
The section between La Serena and Vallenar on Route 5 North consists of a comprehensive improvement of the section from the north exit of the city of La Serena to the southern access to Vallenar, with an approximate length of 187 kilometers.
Protechning contributes to the work with topographic field work, both for earthworks and structures.
Railways
Protechning has worked on large and small railway projects that range from track construction to the remodeling of stations, track changes, plate track assembly, track renewal, ballast shaking, … Our professionals have carried out all kinds of work on topography, control of track parameters, catenary, plate track, ballast, geometry adjustment, … We have provided professionals for both high-speed lines such as metro or tram. We believe in the competition of this means of transport being one of the most sustainable. For this reason, we study the most competent profiles for carrying out the activities involved in these projects.
Project Follo Line
The Follo Line Project is currently the largest transport project in Norway. The project consists of a new 22 km double-track railway line between Oslo Central Station and the new station at Ski, south of Oslo.
HS2
HS2 Project (High Speed Line 2) that will connect London to Birmingham in 2026 (Phase 1) and, later, in 2033, will extend to Manchester and Leeds (Phase 2), with a “Y” configuration. The Line is being designed for a maximum speed of 400 km / h and, once completed, will allow a peak hour frequency of 18 trains per direction.
Oran Tram
The Oran Tramway is one of his most emblematic works in the Middle East. With the capacity to transport 90,000 passengers a day, it will allow up to 88 million people to use its facilities annually.
Underground London. Bank Station
The works will increase the station's capacity by 40%, improving accessibility and reducing interchange times when completed in 2021. The station will remain open for the five-year project.
Mostaganem Tram Line
The Project consists of the first line of the Mostaganem tram, in Algeria, a 14-kilometer railway infrastructure that will have 24 stations and that can meet the demand of this population of 150,000 inhabitants. The project has a budget of 250 million euros, under the turnkey modality.
Metropolitano of Lima, Lines 2 & 4
The project consists of a 35-year concession for the project, financing, construction, operation and maintenance of line 2 and a branch of line 4 of the Lima Metro that goes to Jorge Chávez International airport.
Underground London. Northern Line Extension
La extensión de la línea Northern hacia Battersea parte desde Kennington hasta Battersea en el sudoeste de Londres, terminando en la remodelada Battersea Power Station. La obra forma una continuación de la rama de la línea Charing Cross. Comprende dos nuevas estaciones subterráneas en Battersea Power Station y Nine Elms, que terminan en un nuevo distrito de embajadas, incluyendo, entre otras, la embajada de los Estados Unidos y la embajada holandesa.
Project Follo Line
The Follo Line Project is currently the largest transport project in Norway. The project consists of a new 22 km double-track railway line between Oslo Central Station and the new station at Ski, south of Oslo. The main part of the 20 km long tunnel will be built, which will be the longest in Scandinavia when completed in late 2022.
The project consists of five EPC contracts, in which the tunnel construction with TBM is the largest.
Protechning provides tunnel, surface surveyors and surveying aids.
HS2
HS2 Project (High Speed Line 2) that will connect London to Birmingham in 2026 (Phase 1) and, later, in 2033, will extend to Manchester and Leeds (Phase 2), with a “Y” configuration. The Line is being designed for a maximum speed of 400 km / h and, once completed, will allow a peak hour frequency of 18 trains per direction. The total expected cost is £ 56 billion. Phase 1, with a length of 225 km, will have four stations, two in London and two in Birmingham (one of them at the airport). Phase 2 will be 360 km long and have four stations, two in Manchester (one of them at the airport), another in the vicinity of Nottingham, and the fourth in Leeds.
Protechning participates in the design phase with specialized drafters in high speed train projects.
Oran Tram
The Oran Tramway is one of his most emblematic works in the Middle East. With the capacity to transport 90,000 passengers a day, it will allow up to 88 million people to use its facilities annually.
The Oran Tram, with a budget of 365 million euros, has a bidirectional line of 18.7 kilometers in length with 32 stations, 11 electrical substations, two viaducts and an underpass. At one end, in “Sidi Màarouf”, some 70,000 m2 garages were built with a workshop, a washing tunnel, a service station, a System Control Center (PCC) and an administrative building, at the other end, in “ Es Senia ”, an 11,750 m2 train parking lot was built outside with an administrative control building.
Protechning provided surface surveyors and surveying aids as well as delineation specialists.
Underground London. Bank Station
The works will increase the station's capacity by 40%, improving accessibility and reducing interchange times when completed in 2021. The station will remain open for the five-year project. The changes will include a new rail tunnel and a platform for the Northern line that will reduce interchange times and create more space for passengers, seamless access to the Northern line and DLR platforms, more direct routes, with two new mobile walkways, three new elevators, 12 new escalators, and a new station entrance on Cannon Street.
Protechning contributes to the work with specialized Auscultation Engineers.
Mostaganem Tram Line
The Project consists of the first line of the Mostaganem tram, in Algeria, a 14-kilometer railway infrastructure that will have 24 stations and that can meet the demand of this population of 150,000 inhabitants. The project has a budget of 250 million euros, under the turnkey modality.
Protechning contributed surface surveyors and topography assistants.
Metropolitano of Lima, Lines 2 & 4
The project consists of a 35-year concession for the project, financing, construction, operation and maintenance of line 2 and a branch of line 4 of the Lima Metro that goes to Jorge Chávez International airport.
Line 2 runs from the Puerta de Callao station to the Municipalidad de Ate station and includes 26.87 km of tunnel, 27 stations (two interchanges), three third routes, a patio-workshop in Santa Anita and 27 ventilation shafts and emergency. The branch of line 4 runs from Gambetta Station to Carmen de la Legua Station and includes 7.66 km of tunnel, 8 stations (an interchange), a patio-workshop in Bocanegra and 8 ventilation and emergency wells.
The excavation is carried out with two TBMs operated in EPB mode as well as an 8 km section in conventional.
Protechning contributed to the work with a Draftsman, BIM specialist, tunnel shift engineers, Tunnel and Auscultation supervisors and assistants.
Underground London. Northern Line Extension
The Northern Line extension to Battersea departs from Kennington to Battersea in southwest London, ending at the remodeled Battersea Power Station. The work forms a continuation of the branch of the Charing Cross line. It comprises two new underground stations at Battersea Power Station and Nine Elms, which end in a new embassy district, including, but not limited to, the United States Embassy and the Dutch Embassy.
Protechning contributes to the work with a Draftsman, BIM specialist, tunnel shift engineers, Tunnel and Auscultation supervisors and assistants.
Tunnels
Protechning is one of the most experienced companies in tunnel construction with tunnel machine, having participated in several of the largest tunnel construction projects worldwide. We have provided specialized personnel for each tunnel boring machine, as well as specialized advancement software for the tunnel boring machine. We provide all kinds of specialized personnel such as shift engineer, shift managers, control room engineers, tunnel surveying, tunnel and external auscultation, … We operate our resources to offer our most prepared personnel, being aware that these are projects that carry a great responsibility given its complexity.
Thames Tideway Tunnel, Central Section
The stretch is divided into two sections of 7.2 meters in diameter, both starting from Kirtling Street. The first, 5 kilometers long, heads east until it reaches CarnwathRoad, while the second, 7.7 kilometers long, moves west until it ends at Chambers Wharf.
Project Follo Line
The Follo Line Project is currently the largest transport project in Norway. The project consists of a new 22 km double-track railway line between Oslo Central Station and the new station at Ski, south of Oslo.
Metropolitano of Lima, Lines 2 & 4
The project consists of a 35-year concession for the project, financing, construction, operation and maintenance of line 2 and a branch of line 4 of the Lima Metro that goes to Jorge Chávez International airport.
Underground London. Northern Line Extension
La extensión de la línea Northern hacia Battersea parte desde Kennington hasta Battersea en el sudoeste de Londres, terminando en la remodelada Battersea Power Station. La obra forma una continuación de la rama de la línea Charing Cross. Comprende dos nuevas estaciones subterráneas en Battersea Power Station y Nine Elms, que terminan en un nuevo distrito de embajadas, incluyendo, entre otras, la embajada de los Estados Unidos y la embajada holandesa.
Thames Tideway Tunnel, Central Section
The stretch is divided into two sections of 7.2 meters in diameter, both starting from Kirtling Street. The first, 5 kilometers long, heads east until it reaches CarnwathRoad, while the second, 7.7 kilometers long, moves west until it ends at Chambers Wharf. The 12.7 kilometers that the central section measures make it the longest in the tunnel, which will have a total length of 25 kilometers. The contract also includes the construction of 8 wells between 42 and 62 meters deep, 6 connection tunnels, sewers, interception chambers and valves.
Protechning provides tunnel surveyors, surface surveyors and surveying assistants, as well as civil tunnel engineers, shift managers, tunnel boring machine drivers, and segment specialists.
Project Follo Line
The Follo Line Project is currently the largest transport project in Norway. The project consists of a new 22 km double-track railway line between Oslo Central Station and the new station at Ski, south of Oslo. The main part of the 20 km long tunnel will be built, which will be the longest in Scandinavia when completed in late 2022.
The project consists of five EPC contracts, in which the tunnel construction with TBM is the largest.
Protechning provides tunnel, surface surveyors and surveying aids.
Metropolitano of Lima, Lines 2 & 4
The project consists of a 35-year concession for the project, financing, construction, operation and maintenance of line 2 and a branch of line 4 of the Lima Metro that goes to Jorge Chávez International airport.
Line 2 runs from the Puerta de Callao station to the Municipalidad de Ate station and includes 26.87 km of tunnel, 27 stations (two interchanges), three third routes, a patio-workshop in Santa Anita and 27 ventilation shafts and emergency. The branch of line 4 runs from Gambetta Station to Carmen de la Legua Station and includes 7.66 km of tunnel, 8 stations (an interchange), a patio-workshop in Bocanegra and 8 ventilation and emergency wells.
The excavation is carried out with two TBMs operated in EPB mode as well as an 8 km section in conventional.
Protechning contributed to the work with a Draftsman, BIM specialist, tunnel shift engineers, Tunnel and Auscultation supervisors and assistants.
Underground London. Northern Line Extension
The Northern Line extension to Battersea departs from Kennington to Battersea in southwest London, ending at the remodeled Battersea Power Station. The work forms a continuation of the branch of the Charing Cross line. It comprises two new underground stations at Battersea Power Station and Nine Elms, which end in a new embassy district, including, but not limited to, the United States Embassy and the Dutch Embassy.
Protechning contributes to the work with a Draftsman, BIM specialist, tunnel shift engineers, Tunnel and Auscultation supervisors and assistants.
Bridges
Protechning participates in different projects for the construction of large bridges, having carried out cable-stayed, hanging, girder, arch bridges etc, providing professionals specialized in this type of project, both in calculation of the structures and in the execution and control of the work. We have participated in different international projects through our surveying, auscultation, calculation workers, production engineers, … Protechning is currently participating in bridge renovation projects on highways and marine bridges.
Winston-Salem Northern Beltway
The project involves the construction of a new 3-lane highway for each direction over 4 miles (6.4 km) between US 158 and I-40 in Forsyth County. The work also includes the corresponding links with these two highways, the construction of 18 bridges and the placement of acoustic screens.
US 181 Harbor Bridge Replacement
The project involves the construction of the largest cable-stayed bridge in the United States. This bridge crosses the entrance channel to the port of Corpus Christi, with six sections and a maximum span of 504 meters in the main section.
D4R7 Bratislava
El D4R7- Bratislava Bypass consiste en el diseño, construcción, financiación y operación de 27 km de la autopista D4 alrededor de Bratislava, Eslovaquia, así como de 32 km de la autopista R7.
Oran Tram
The Oran Tramway is one of his most emblematic works in the Middle East. With the capacity to transport 90,000 passengers a day, it will allow up to 88 million people to use its facilities annually.
Homestead Extension of Florida’s Turnpike (HEFT)
Extension of SR 821 (HEFT) from Florida Turnpike to south of Miramar Parkway, in Miami-Dade and Broward counties. The HEFT main highway widens from four lanes to eight lanes, three 12-foot general-purpose lanes and a 12-foot express lane.
N25 New Ross Bypass
The N25 New Ross Bypass is a 14km dual carriageway that includes new connections on National Routes N25 and N30. The beltway begins on the N25 at Glenmore
Winston-Salem Northern Beltway
The project involves the construction of a new 3-lane highway for each direction over 4 miles (6.4 km) between US 158 and I-40 in Forsyth County. The work also includes the corresponding links with these two highways, the construction of 18 bridges and the placement of acoustic screens.
Protechning contributed the Directorate of Topography, as well as office and field topography and the Directorate of Earthworks
US 181 Harbor Bridge Replacement
The project involves the construction of the largest cable-stayed bridge in the United States. This bridge crosses the entrance channel to the port of Corpus Christi, with six sections and a maximum span of 504 meters in the main section. The structure is 62 meters wide to allow access to the Corpus Christi port for the largest transoceanic ships, including those that cross the Panama Canal.
Protechning contributed to the project the head of the Purchasing Department, as well as purchasing technicians.
D4R7 Bratislava
El D4R7- Bratislava Bypass consiste en el diseño, construcción, financiación y operación de 27 km de la autopista D4 alrededor de Bratislava, Eslovaquia, así como de 32 km de la autopista R7. La nueva autopista D4 de 27 km creará un desvío hacia el este de la ciudad y una conexión con las carreteras radiales existentes. El proyecto también implica la construcción de la nueva autopista radial R7 de 32 kilómetros, que corre en dirección sur-este desde el centro de la ciudad.
El proyecto contruirá 14 conexiones con autopistas existentes, 122 puentes y un gran puente sobre el Danubio.
Protechning proporciona equipos de topografía de campo especializados en carreteras y grandes estructuras
Oran Tram
The Oran Tramway is one of his most emblematic works in the Middle East. With the capacity to transport 90,000 passengers a day, it will allow up to 88 million people to use its facilities annually.
The Oran Tram, with a budget of 365 million euros, has a bidirectional line of 18.7 kilometers in length with 32 stations, 11 electrical substations, two viaducts and an underpass. At one end, in “Sidi Màarouf”, some 70,000 m2 garages were built with a workshop, a washing tunnel, a service station, a System Control Center (PCC) and an administrative building, at the other end, in “ Es Senia ”, an 11,750 m2 train parking lot was built outside with an administrative control building.
Protechning provided surface surveyors and surveying aids as well as delineation specialists.
Homestead Extension of Florida’s Turnpike (HEFT)
Extension of SR 821 (HEFT) from Florida Turnpike to south of Miramar Parkway, in Miami-Dade and Broward counties. The HEFT main highway widens from four lanes to eight lanes, three 12-foot general-purpose lanes and a 12-foot express lane. Other project work includes milling and repaving, road widening, bridge widening, pavement marking, lighting, ITS, noise walls, and drainage improvements.
Protechning provides specialized field surveying equipment, as well as surveying headquarters.
N25 New Ross Bypass
The N25 New Ross Bypass is a 14km dual carriageway that includes new connections on National Routes N25 and N30. The beltway begins on the N25 at Glenmore, then crosses the Barrow River with a 3-stack bridge approximately 900 meters long from Pink Point to Stokestown in Wexford County and continues to the N30 junction at Corcorans Cross.
Protechning contributed the topographic field work, both for earthworks and structures.
Buildings
Protechning has participated in construction projects for big edifications such as shopping centers, train stations or industrial plants. We offer specialized personnel to provide solutions in comprehensive management and technical assistance in buildings and facilities. We provide professionals from all areas, from surveying, auscultation of big edifications, construction production or installation and maintenance of industrial facilities and equipment such as air conditioning or communications. Our technicians carry out their work adapting to the different local regulations that affect the installation and the necessary certifications for the correct execution of the project.
Battersea Power Station
Battersea Power Station is a London Underground station under construction, as part of the North Line Extension (NLE). The future station will be located in Zone 1, and is part of the extension from Kennington to attend the remodeling of the Battersea Power Station. The station will serve as a terminal for the new line, and will also serve as an interchange with the Battersea Park train station.
1390 MW Waad Al Shamal Combined Cycle Power Plant
The project includes the construction of a 1,390 megawatt combined cycle power plant located in the mining town of Waad Al Shamal, Saudi Arabia.
Remodeling of the Main Terminal at Denver airport
The "Great Hall" project carried out an improvement to the Jeppesen terminal of the Denver International Airport that covers an area of more than 70,000 square meters.
Underground London. Bank Station
The works will increase the station's capacity by 40%, improving accessibility and reducing interchange times when completed in 2021. The station will remain open for the five-year project.
Bellara Steel Complex
The project is a steel complex in Bellara, northeast of Algeria, for an overall amount of 154 million dollars (about 137.5 million euros). The project consists of the execution of the Plant Balance (BOP) works of the steel complex promoted by the Algerian Qatari Steel corporation in the Bellaraindustrial zone.
Battersea Power Station
Battersea Power Station is a London Underground station under construction, as part of the North Line Extension (NLE). The future station will be located in Zone 1, and is part of the extension from Kennington to attend the remodeling of the Battersea Power Station. The station will serve as a terminal for the new line, and will also serve as an interchange with the Battersea Park train station. The station has an entrance architecture created by Grimshaw. Art on the Underground has commissioned artist Alexandre da Cunha to install a permanent work of art in the station's ticket hall - a 100-meter-long kinetic sculpture.
Protechning provides BIM designers and designers.
1390 MW Waad Al Shamal Combined Cycle Power Plant
The project includes the construction of a 1,390 megawatt combined cycle power plant located in the mining town of Waad Al Shamal, Saudi Arabia. The plant also includes 50 megawatts of the concentrated solar plant that will integrate with the CCGT water-steam cycle. The project will be able to provide the equivalent energy needed to supply more than 500,000 Saudi homes.
Protechning contributed the Direction of Topography, as well as office and field topography, civil field engineers for foundations and the direction of the quality department.
Remodeling of the Main Terminal at Denver airport
The "Great Hall" project carried out an improvement to the Jeppesen terminal of the Denver International Airport that covers an area of more than 70,000 square meters. Improvements include new commercial and restaurant areas, relocation and expansion of security zones, improvement of access to the building and passenger traffic flows, a new check-in area and optimization of space and efficiency of the terminal.
Protechning contributed two field surveyors specialized in construction of structures.
Underground London. Bank Station
The works will increase the station's capacity by 40%, improving accessibility and reducing interchange times when completed in 2021. The station will remain open for the five-year project. The changes will include a new rail tunnel and a platform for the Northern line that will reduce interchange times and create more space for passengers, seamless access to the Northern line and DLR platforms, more direct routes, with two new mobile walkways, three new elevators, 12 new escalators, and a new station entrance on Cannon Street.
Protechning contributes to the work with specialized Auscultation Engineers.
Bellara Steel Complex
The project is a steel complex in Bellara, northeast of Algeria, for an overall amount of 154 million dollars (about 137.5 million euros). The project consists of the execution of the Plant Balance (BOP) works of the steel complex promoted by the Algerian Qatari Steel corporation in the Bellaraindustrial zone.
Protechning provided surveyors and draftsmen for the auscultation works.
Energy
Protechning operates by offering specialized personnel both in the preliminary works and in the construction phase of wind, photovoltaic, nuclear, hydroelectric and thermoelectric parks. We have participated through our professionals in the design, surveying and execution of work with civil engineers specialized in foundations and industrial engineers specialized in each of the fields involved in these works. Our staff contributes values of responsibility, trust and innovation in these projects that manage to respect the environment.
1390 MW Waad Al Shamal Combined Cycle Power Plant
The project includes the construction of a 1,390 megawatt combined cycle power plant located in the mining town of Waad Al Shamal, Saudi Arabia.
Escatron project Solar Pant
The project consists of a large energy installation that will be the largest of its kind to be commissioned in Europe with a combined power of 850 megawatts (MW) and a total of 3,173 hectares of surface among the 18 plants that make up the project.
Bellara Steel Complex
The project is a steel complex in Bellara, northeast of Algeria, for an overall amount of 154 million dollars (about 137.5 million euros). The project consists of the execution of the Plant Balance (BOP) works of the steel complex promoted by the Algerian Qatari Steel corporation in the Bellaraindustrial zone.
1390 MW Waad Al Shamal Combined Cycle Power Plant
The project includes the construction of a 1,390 megawatt combined cycle power plant located in the mining town of Waad Al Shamal, Saudi Arabia. The plant also includes 50 megawatts of the concentrated solar plant that will integrate with the CCGT water-steam cycle. The project will be able to provide the equivalent energy needed to supply more than 500,000 Saudi homes.
Protechning contributed the Direction of Topography, as well as office and field topography, civil field engineers for foundations and the direction of the quality department.
Escatron project Solar Pant
The project consists of a large energy installation that will be the largest of its kind to be commissioned in Europe with a combined power of 850 megawatts (MW) and a total of 3,173 hectares of surface among the 18 plants that make up the project.
The investment in the project is around 500 million euros, making it a unique initiative that will place the Aragonese community at the forefront of renewable energy worldwide. 850 MW will be developed, 54% of the 1,550 that was awarded in the third renewable energy auction of the Ministry of Energy. Escatrón will be the epicenter of this photovoltaic complex, hosting ten of the 18 plants in its term, while five will be in Chiprana and another three in Samper de Calanda.
Protechning provides surface surveyors and surveying aids. As well as specialists in occupational risk prevention.
Bellara Steel Complex
The project is a steel complex in Bellara, northeast of Algeria, for an overall amount of 154 million dollars (about 137.5 million euros). The project consists of the execution of the Plant Balance (BOP) works of the steel complex promoted by the Algerian Qatari Steel corporation in the Bellaraindustrial zone.
Protechning provided surveyors and draftsmen for the auscultation works.